Global Magnetosphere Real Event Analysis from Runs on Request     (VMR Tools)

Analysis of Run: Eftyhia_Zesta_071602_3

return to list


Satellite Data Available Data-Model Comparison Model on Satellite Track Run information:
GOES-8B plot
GOES-9B plot
GOES-10-
GeotailB plot
IMP-8B plot
PolarB plot
WindB plot
B plot
B plot
-
B plot
B plot
B plot
-
plot
plot
plot
plot
plot
plot
-
View standard CCMC run page.??
Event DateJanuary 6 1998
Start Time1998/01/06 13:00
End Time1998/01/06 15:00
Key WordsPressure Pulse
ModelBATSRUS
Model Versionv7.42
Validation Level0
Coordinate System for InputGSM
Coordinate System for OutputGSM
Dipole Tilt, in the X-Z Plane, at Start deg-16.30
Dipole Tilt, in Y-Z GSE plane, deg-2.90
Update Dipole Orientation with Timeyes
Inflow Boundary R_E33
F10.7150.00000
Conductance Modelauroral
Corotationyes
Run NumberEftyhia_Zesta_071602_3
Minimum Dst Value8
SW SourceDSCOVR-realtime
Diagnostic IndicesNO

View interactive javascript plot of satellite positions during this run in a new window.

Model values plot for Geotail for time period of this run.

Choose variable to plot:
VMR Tools created by Darren De Zeeuw.