Global Magnetosphere Real Event Analysis from Runs on Request     (VMR Tools)

Analysis of Run: Misha_Hayosh_050604_4

return to list


Satellite Data Available Data-Model Comparison Model on Satellite Track Run information:
GOES-8B plot
GOES-9B plot
GeotailB plot
IMP-8B plot
PolarB plot
WindB plot
-
-
-
-
-
-
-
-
-
-
-
-
View standard CCMC run page.??
Event DateMarch 20 1997
Start Time1997/03/20 12:01
End Time1997/03/20 18:59
Key WordsMagnetosheath
ModelBATSRUS
Model Versionv7.42
Validation Level2
Coordinate System for InputGSM
Coordinate System for OutputGSM
Dipole Tilt, in the X-Z Plane, at Start deg3.30
Dipole Tilt, in Y-Z GSE plane, deg12.90
Update Dipole Orientation with Timeyes
Inflow Boundary R_E33
F10.7150.00000
Conductance Modelauroral
Corotationyes
Run NumberMisha_Hayosh_050604_4
Minimum Dst Value5
SW SourceDSCOVR-realtime
Diagnostic IndicesNO

View interactive javascript plot of satellite positions during this run in a new window.

Satellite data B plot for IMP-8 for time period of this run.

VMR Tools created by Darren De Zeeuw.