Global Magnetosphere Real Event Analysis from Runs on Request     (VMR Tools)

Analysis of Run: CCMC_CCMC_123008_1

return to list


Satellite Data Available Data-Model Comparison Model on Satellite Track Run information:
GOES-10B plot
GOES-12B plot
GeotailB plot
PolarB plot
WindB plot
B plot
B plot
-
-
-
plot
plot
-
-
-
View standard CCMC run page.??
Event DateOctober 29 2003
Start Time2003/10/29 06:00
End Time2003/10/30 06:00
Key WordsGEM 2008 Metrics Challenge
ModelOpenGGCM
Model Version3.1
Validation Level0
Coordinate System for InputGSM
Coordinate System for OutputGSE
Dipole Tilt, in the X-Z Plane, at Start deg-2.50
Dipole Tilt, in Y-Z GSE plane, deg-19.30
Update Dipole Orientation with Timeno
Inflow Boundary R_E24
F10.7275.00000
Conductance ModelSig-CTIM
Corotationno
Run NumberCCMC_CCMC_123008_1
Minimum Dst Value-353
SW SourceDSCOVR-realtime
Diagnostic IndicesNO

Model values plot for GOES-10 for time period of this run.

Choose variable to plot:
VMR Tools created by Darren De Zeeuw.