Global Magnetosphere Real Event Analysis from Runs on Request     (VMR Tools)

Analysis of Run: Yan_Meng_122620_1

return to list


Satellite Data Available Data-Model Comparison Model on Satellite Track Run information:
GOES-8B plot
GOES-10B plot
GeotailB plot
PolarB plot
WindB plot
-
-
-
-
-
-
-
-
-
-
View standard CCMC run page.??
Event DateApril 11, 2002
Start Time2002/04/11 00:00
End Time2002/04/15 00:00
Key Words2002a
ModelSWMF
Model Versionv20180525
Validation Level0
Coordinate System for InputGSM
Coordinate System for OutputGSM
Dipole Tilt, in the X-Z Plane, at Start deg5.72
Dipole Tilt, in Y-Z GSE plane, deg31.93
Update Dipole Orientation with Timeyes
Inflow Boundary R_E33
F10.7198.30000
Conductance Modelauroral
Corotationreal
Run NumberYan_Meng_122620_1
Minimum Dst Value-48
SW Sourceunknown
Diagnostic IndicesNO

Satellite data B plot for Geotail for time period of this run.

VMR Tools created by Darren De Zeeuw.