Global Magnetosphere Real Event Analysis from Runs on Request     (VMR Tools)

Analysis of Run: Dimitrios_Athanasopoulos_041719_7

return to list


Satellite Data Available Data-Model Comparison Model on Satellite Track Run information:
GOES-8B plot
GOES-9-
GOES-10B plot
GOES-11-
GOES-12-
GeotailB plot
PolarB plot
WindB plot
B plot
-
B plot
-
-
-
-
-
plot
plot
plot
plot
plot
-
-
-
View standard CCMC run page.??
Event DateNovember 05, 2001
Start Time2001/11/05 12:00
End Time2001/11/07 12:00
Key WordsGM_MODEL Samba
ModelSWMF
Model Versionv20180525
Validation Level0
Coordinate System for InputGSM
Coordinate System for OutputGSM
Dipole Tilt, in the X-Z Plane, at Start deg-13.03
Dipole Tilt, in Y-Z GSE plane, deg-27.34
Update Dipole Orientation with Timeyes
Inflow Boundary R_E32
F10.7230.60000
Conductance Modelauroral
Corotationreal
Run NumberDimitrios_Athanasopoulos_041719_7
Minimum Dst Value-292
SW SourceACE-realtime
Diagnostic IndicesYES, plot them

View interactive javascript plot of satellite positions during this run in a new window.

Model values plot for GOES-8 for time period of this run.

Choose variable to plot:
VMR Tools created by Darren De Zeeuw.