Global Magnetosphere Real Event Analysis from Runs on Request     (VMR Tools)

Analysis of Run: Xu_Luning_041319_1

return to list


Satellite Data Available Data-Model Comparison Model on Satellite Track Run information:
GOES-8B plot
GOES-9-
GOES-10-
GeotailB plot
IMP-8B plot
PolarB plot
WindB plot
B plot
-
-
B plot
B plot
B plot
-
plot
plot
plot
plot
plot
plot
-
View standard CCMC run page.??
Event DateOctober 18, 1998
Start Time1998/10/18 12:00
End Time1998/10/19 07:55
Key Words18-Oct-98
ModelSWMF
Model Versionv20180525
Validation Level0
Coordinate System for InputGSM
Coordinate System for OutputGSM
Dipole Tilt, in the X-Z Plane, at Start deg-6.49
Dipole Tilt, in Y-Z GSE plane, deg-31.24
Update Dipole Orientation with Timeyes
Inflow Boundary R_E33
F10.7125.00000
Conductance Modelauroral
Corotationreal
Run NumberXu_Luning_041319_1
Minimum Dst Value-85
SW SourceACE-realtime
Diagnostic IndicesYES, plot them

View interactive javascript plot of satellite positions during this run in a new window.

Model values plot for Geotail for time period of this run.

Choose variable to plot:
VMR Tools created by Darren De Zeeuw.