Global Magnetosphere Real Event Analysis from Runs on Request     (VMR Tools)

Analysis of Run: Xiantong_Wang_010719_1

return to list


Satellite Data Available Data-Model Comparison Model on Satellite Track Run information:
GOES-8B plot
GOES-10B plot
GeotailB plot
PolarB plot
WindB plot
-
-
-
-
-
-
-
-
-
-
View standard CCMC run page.??
Event DateOctober 24, 2002
Start Time2002/10/24 00:00
End Time2002/10/24 23:59
Key Wordssubstorm
ModelSWMF
Model Versionv20180525
Validation Level0
Coordinate System for InputGSM
Coordinate System for OutputGSM
Dipole Tilt, in the X-Z Plane, at Start deg-15.59
Dipole Tilt, in Y-Z GSE plane, deg-10.58
Update Dipole Orientation with Timeyes
Inflow Boundary R_E32
F10.7158.50000
Conductance Modelauroral
Corotationreal
Run NumberXiantong_Wang_010719_1
Minimum Dst Value-98
SW SourceACE-realtime
Diagnostic IndicesYES, plot them
VMR Tools created by Darren De Zeeuw.