Global Magnetosphere Real Event Analysis from Runs on Request     (VMR Tools)

Analysis of Run: CCMC_CCMC_062003_1.1

return to list


Satellite Data Available Data-Model Comparison Model on Satellite Track Run information:
GOES-8B plot
GOES-10B plot
GeotailB plot
PolarB plot
WindB plot
-
-
-
-
-
-
-
-
-
-
View standard CCMC run page.??
Event DateJuly 15 2000
Start Time2000/07/15 13:00
End Time2000/07/16 0:00
Key WordsBastille Day Storm
ModelBATSRUS
Model Versionv7.42
Validation Level0
Coordinate System for InputGSM
Coordinate System for OutputGSM
Dipole Tilt, in the X-Z Plane, at Start deg28.50
Dipole Tilt, in Y-Z GSE plane, deg-20.20
Update Dipole Orientation with Timeyes
Inflow Boundary R_E33
F10.7200.00000
Conductance Modelconstant SigP=SigH=10
Corotationyes
Run NumberCCMC_CCMC_062003_1.1
Minimum Dst Value-289
SW SourceDSCOVR-realtime
Diagnostic IndicesNO

View interactive javascript plot of satellite positions during this run in a new window.

Satellite data B plot for GOES-8 for time period of this run.

VMR Tools created by Darren De Zeeuw.