Global Magnetosphere Real Event Analysis from Runs on Request     (VMR Tools)

Analysis of Run: orbit365-07-20021110_045400_20021110_093900-constBx0

return to list


Satellite Data Available Data-Model Comparison Model on Satellite Track Run information:
Cluster-1-
Cluster-2-
Cluster-3-
Cluster-4-
GOES-8B plot
GOES-9-
GOES-10B plot
GOES-11-
GOES-12-
GeotailB plot
IMP-8-
PolarB plot
WindB plot
-
-
-
-
B plot
-
B plot
-
-
B plot
-
B plot
-
plot
plot
plot
plot
plot
plot
plot
plot
plot
plot
plot
plot
-
View standard CCMC run page.??
Event Date2002/11/10
Start Time2002/11/10 04:54
End Time2002/11/10 09:37
Key WordsFacsko et al 2016: 1-year run of GUMICS
ModelGUMICS
Model Version4-HC
Validation Level1
Coordinate System for InputGSM
Coordinate System for OutputGSE
Dipole Tilt, in the X-Z Plane, at Start deg26.35
Dipole Tilt, in Y-Z GSE plane, deg24.21
Update Dipole Orientation with Timeno
Inflow Boundary R_E32
F10.7187.70000
Conductance Modelauroral
Corotation
Run Numberorbit365-07-20021110_045400_20021110_093900-constBx0
Minimum Dst Value-28
SW SourceDSCOVR-realtime
Diagnostic IndicesNO

View interactive javascript plot of satellite positions during this run in a new window.

Model values plot for Polar for time period of this run.

Choose variable to plot:
VMR Tools created by Darren De Zeeuw.