Global Magnetosphere Real Event Analysis from Runs on Request     (VMR Tools)

Analysis of Run: orbit360-08-20021029_121300_20021029_165800-constBx0

return to list


Satellite Data Available Data-Model Comparison Model on Satellite Track Run information:
Cluster-1-
Cluster-2-
Cluster-3-
Cluster-4-
GOES-8B plot
GOES-9-
GOES-10B plot
GOES-11-
GOES-12-
GeotailB plot
IMP-8-
PolarB plot
WindB plot
-
-
-
-
B plot
-
B plot
-
-
B plot
-
B plot
-
plot
plot
plot
plot
plot
plot
plot
plot
plot
plot
plot
plot
-
View standard CCMC run page.??
Event Date2002/10/29
Start Time2002/10/29 12:13
End Time2002/10/29 16:56
Key WordsFacsko et al 2016: 1-year run of GUMICS
ModelGUMICS
Model Version4-HC
Validation Level1
Coordinate System for InputGSM
Coordinate System for OutputGSE
Dipole Tilt, in the X-Z Plane, at Start deg5.58
Dipole Tilt, in Y-Z GSE plane, deg25.36
Update Dipole Orientation with Timeno
Inflow Boundary R_E32
F10.7159.40000
Conductance Modelauroral
Corotation
Run Numberorbit360-08-20021029_121300_20021029_165800-constBx0
Minimum Dst Value-34
SW SourceDSCOVR-realtime
Diagnostic IndicesNO

View interactive javascript plot of satellite positions during this run in a new window.

Data/Model comparison B plot for Polar for time period of this run.

VMR Tools created by Darren De Zeeuw.