Global Magnetosphere Real Event Analysis from Runs on Request     (VMR Tools)

Analysis of Run: orbit356-11-20021020_140700_20021020_185200-constBx0

return to list


Satellite Data Available Data-Model Comparison Model on Satellite Track Run information:
Cluster-1-
Cluster-2-
Cluster-3-
Cluster-4-
GOES-8B plot
GOES-9-
GOES-10B plot
GOES-11-
GOES-12-
GeotailB plot
IMP-8-
PolarB plot
WindB plot
-
-
-
-
B plot
-
B plot
-
-
B plot
-
B plot
-
plot
plot
plot
plot
plot
plot
plot
plot
plot
plot
plot
plot
-
View standard CCMC run page.??
Event Date2002/10/20
Start Time2002/10/20 14:07
End Time2002/10/20 18:50
Key WordsFacsko et al 2016: 1-year run of GUMICS
ModelGUMICS
Model Version4-HC
Validation Level1
Coordinate System for InputGSM
Coordinate System for OutputGSE
Dipole Tilt, in the X-Z Plane, at Start deg0.84
Dipole Tilt, in Y-Z GSE plane, deg24.83
Update Dipole Orientation with Timeno
Inflow Boundary R_E32
F10.7178.70000
Conductance Modelauroral
Corotation
Run Numberorbit356-11-20021020_140700_20021020_185200-constBx0
Minimum Dst Value-29
SW SourceDSCOVR-realtime
Diagnostic IndicesNO

View interactive javascript plot of satellite positions during this run in a new window.

Model values plot for Geotail for time period of this run.

Choose variable to plot:
VMR Tools created by Darren De Zeeuw.