Global Magnetosphere Real Event Analysis from Runs on Request     (VMR Tools)

Analysis of Run: orbit296-07-20020529_234200_20020530_042600-constBx0

return to list


Satellite Data Available Data-Model Comparison Model on Satellite Track Run information:
Cluster-1-
Cluster-2-
Cluster-3-
Cluster-4-
GOES-8B plot
GOES-9-
GOES-10B plot
GOES-11-
GOES-12-
GeotailB plot
IMP-8-
Polar-
WindB plot
-
-
-
-
B plot
-
B plot
-
-
B plot
-
-
-
plot
plot
plot
plot
plot
plot
plot
plot
plot
plot
plot
plot
-
View standard CCMC run page.??
Event Date2002/05/29
Start Time2002/05/29 23:42
End Time2002/05/30 04:24
Key WordsFacsko et al 2016: 1-year run of GUMICS
ModelGUMICS
Model Version4-HC
Validation Level1
Coordinate System for InputGSM
Coordinate System for OutputGSE
Dipole Tilt, in the X-Z Plane, at Start deg-14.76
Dipole Tilt, in Y-Z GSE plane, deg-16.50
Update Dipole Orientation with Timeno
Inflow Boundary R_E32
F10.7189.80000
Conductance Modelauroral
Corotation
Run Numberorbit296-07-20020529_234200_20020530_042600-constBx0
Minimum Dst Value-12
SW SourceDSCOVR-realtime
Diagnostic IndicesNO

View interactive javascript plot of satellite positions during this run in a new window.

Model values plot for Cluster-1 for time period of this run.

Choose variable to plot:
VMR Tools created by Darren De Zeeuw.