Global Magnetosphere Real Event Analysis from Runs on Request     (VMR Tools)

Analysis of Run: orbit249-03-20020206_095100_20020206_143500-constBx0

return to list


Satellite Data Available Data-Model Comparison Model on Satellite Track Run information:
Cluster-1-
Cluster-2-
Cluster-3-
Cluster-4-
GOES-8B plot
GOES-9-
GOES-10B plot
GOES-11-
GOES-12-
GeotailB plot
IMP-8-
PolarB plot
WindB plot
-
-
-
-
B plot
-
B plot
-
-
B plot
-
B plot
-
plot
plot
plot
plot
plot
plot
plot
plot
plot
plot
plot
plot
-
View standard CCMC run page.??
Event Date2002/02/06
Start Time2002/02/06 09:51
End Time2002/02/06 14:33
Key WordsFacsko et al 2016: 1-year run of GUMICS
ModelGUMICS
Model Version4-HC
Validation Level1
Coordinate System for InputGSM
Coordinate System for OutputGSE
Dipole Tilt, in the X-Z Plane, at Start deg12.59
Dipole Tilt, in Y-Z GSE plane, deg-7.53
Update Dipole Orientation with Timeno
Inflow Boundary R_E32
F10.7196.90000
Conductance Modelauroral
Corotation
Run Numberorbit249-03-20020206_095100_20020206_143500-constBx0
Minimum Dst Value-60
SW SourceDSCOVR-realtime
Diagnostic IndicesNO

View interactive javascript plot of satellite positions during this run in a new window.

Model values plot for Polar for time period of this run.

Choose variable to plot:
VMR Tools created by Darren De Zeeuw.