Related Links | Frequently Asked Questions | Community Feedback | Downloads | Sitemap
CCMC Home | CCMC Stakeholders | Our Team | Publications | Meetings and Workshops | Concept of Operations
Models At A Glance | ModelWeb Catalog and Archive
Request Procedures | Generate Input Data Files & Parameters | Movies on Request | About the Run Process | Publications Policy
Search run database | Request run output | Special events | Kameleon Software | Space Weather Explorer | Publications policy
Instant Model Run
Forecasting Support tools | iSWA | DONKI | Mission Support | Experimental Real Time Simulations | Operational Geospace Model Validations
Intl Forum | GEM Challenge | CEDAR ETI Challenge | GEM-CEDAR Challenge | SHINE Challenge | CME Arrival Time Scoreboard | Flare Scoreboard | SEP Scoreboard | IMF Bz Scoreboard
Educational materials &activities | Space Weather REDI Initiative | SW REDI Bootcamp | Student Research Contest | Tutorial at CEDAR | Forecaster Tools
Missions near Earth/in Earth-orbit | MMS | Van Allen Probes | THEMIS | MESSENGER | STEREO | Spitzer | MAVEN | MSL | Dawn | Kepler | EPOXI | Juno | CASSINI | Voyager | New Horizons | Sounding Rockets | International
Research Community Support | CCMC Workshops | NASA Robotic Mission Operator Workshops | LWS Support | Exo-CCMC | DREAM2 Support | HELCATS Support
iSWA | DONKI | Kameleon | StereoCat | EEGGL | CME Scoreboard | SEP Scoreboard | FLR Scoreboard | SEA5
       

Observer Global Shock Connectivities Inferred From ENLIL and SEP Measurements

LWS project page

Simulations in the CCMC Runs-on-Request-Database:

Event DateRun NumberKey WordsModel TypeModel Model Version Carrington Rotation StartCarrington Rotation EndStart DateEnd Date
Modeled Run Leila_Mays_052715_SH_1 2012-07-12 2012-08-01 five CMEs SEPMOD DREAM2HeliosphereENLIL2.8f21252125----
Modeled Run Leila_Mays_033115_SH_1 6 CMEs in August 2010. 10aug_7_v13. ENLIL v2.8e. SEPMOD. EPREM coupling. DREAM2. HeliosphereENLIL2.8e20992099----
Modeled Run Leila_Mays_070215_SH_1 2015-02-28 to 2015-03-19 includes nine CMEs. 15mar_8f_v10_sd6x2. ENLIL v2.8e. SEPMOD. DREAM2. EPREM coupling. HeliosphereENLIL2.8e21602160----
Modeled Run Christina_Lee_053116_SH_1 15 May 2016 CME RT param. MAVEN. SEPMOD. EPREM coupling.HeliosphereENLIL2.8f21772177----
Modeled Run Leila_Mays_062716_SH_1 May 2012. GLE. v1. SEPMOD. EPREM coupling.HeliosphereENLIL2.8f21232123----
Modeled Run Leila_Mays_120816_SH_1 March 2012. DONKI CMEs. SEPMOD. HeliosphereENLIL2.8f00----
Modeled Run Hazel_Bain_120816_SH_1 June 2011. v2. SEPMOD. HeliosphereENLIL2.8f00----
Modeled Run Leila_Mays_120816_SH_2 Sep 2014 CMEs. v2. SEPMOD. HeliosphereENLIL2.8f00----
Modeled Run Leila_Mays_120816_SH_3 13 Dec 2014 CME. v2. SEPMOD. HeliosphereENLIL2.8f00----
Modeled Run Leila_Mays_122116_SH_2 2015-02-28 to 2015-03-19 includes nine CMEs. rerun 15mar_8f_v10_sd6x2. ENLIL v2.8f. SEPMOD. DREAM2. EPREM coupling. HeliosphereENLIL2.8f00----
Modeled Run Oskar_Carlbaum_051717_SH_1 2012-07-12 to 2012-08-01 five CMEs. 12jul_6_sxd1. ENLIL v2.8e. SEPMOD. DREAM2. EPREM coupling. 2 blk HeliosphereENLIL2.8f00----
Modeled Run Oskar_Carlbaum_051717_SH_2 2012-07-12 to 2012-08-01 five CMEs. 12jul_6_sxd1. ENLIL v2.8e. SEPMOD. DREAM2. EPREM coupling. 2 blk. 2AU high res. HeliosphereENLIL2.8f00----
Modeled Run Leila_Mays_072017_SH_1 20170714 CME. RT ensemble member 2. SEPMOD. HeliosphereENLIL2.8f00----
Modeled Run Leila_Mays_080417_SH_1 2017 July CMEs. SEPMOD. EPREM. HeliosphereENLIL2.8f00----
Modeled Run Leila_Mays_080417_SH_2 2017 July CMEs. SEPMOD. EPREM.HeliosphereENLIL2.8f21922192----
Modeled Run Leila_Mays_092017_SH_1 Sep 2017 CMEs. v3 params. SEPMOD. EPREM. HeliosphereENLIL2.8f21942194----
Modeled Run Leila_Mays_101017_SH_5 Sep 2017 CMEs. v7 params. SEPMOD. EPREM. HeliosphereENLIL2.8f00----
Modeled Run Leila_Mays_101017_SH_4 Sep 2017 CMEs. v7 params. SEPMOD. EPREM. HeliosphereENLIL2.8f00----
Modeled Run Leila_Mays_120817_SH_9 Sep 2017 CMEs. v15. dcld 2. dfast 100. SEPMOD. EPREM. HeliosphereENLIL2.8f00----
Modeled Run Leila_Mays_122717_SH_1 2012-07-12 to 2012-08-01 five CMEs. 12jul_6_sxd1. rerun of Leila_Mays_052715_SH_1 with all maps. SEPMOD. EPREM. HeliosphereENLIL2.8f00----
Modeled Run Leila_Mays_053118_SH_1 2015 June. Dawn. SEPMOD. HeliosphereENLIL2.8f00----
Modeled Run Leila_Mays_053118_SH_2 2011 August CMEs. Dawn. SEPMOD HeliosphereENLIL2.8f00----

Event DateRun NumberKey WordsModel TypeModel Model Version Carrington Rotation StartCarrington Rotation EndStart DateEnd Date
Modeled Run Hazel_Bain_080916_SH_1 Nov 2011 - 9 CMEs - prelim v1HeliosphereENLIL2.8f21162116----

Simulations on the CCMC ftp server (to be added to database soon):
5 – 20 March 2013 (2013/64-79)
5 – 22 April 2013 (2013/95-112)
4 – 6 January 2014 (2014/4-16)
14 – 31 October 2014 (2014/287-304)
3 – 11 November 2015 (2015/307-315)

Preliminary:
5-15 October 2013 (2013/278-288)
28 March - 9 April 2014 (2014/87-99)
24 August - 12 September 2014 (2014/236-255)

CCMC Contacts
M. Leila Mays
Peter MacNeice

National Aeronautics and Space Administration Air Force Materiel Command Air Force Office of Scientific Research Air Force Research Laboratory Air Force Weather Agency NOAA Space Environment Center National Science Foundation Office of Naval Research

| | Privacy, Security Notices

CCMC logo designed by artist Nana Bagdavadze