Related Links | Frequently Asked Questions | Community Feedback | Downloads | Sitemap
CCMC Home | CCMC Stakeholders | Our Team | Publications | Meetings and Workshops | Concept of Operations
Models At A Glance | ModelWeb Catalog and Archive
Request Procedures | Generate Input Data Files & Parameters | Movies on Request | About the Run Process | Publications Policy
Search run database | Request run output | Special events | Kameleon Software | Space Weather Explorer | Publications policy
Instant Model Run
Forecasting Support tools | iSWA | DONKI | Mission Support | Experimental Real Time Simulations | Operational Geospace Model Validations
Intl Forum | GEM Challenge | CEDAR ETI Challenge | GEM-CEDAR Challenge | SHINE Challenge | CME Arrival Time Scoreboard | Flare Scoreboard | SEP Scoreboard | IMF Bz Scoreboard
Educational materials &activities | Space Weather REDI Initiative | SW REDI Bootcamp | Student Research Contest | Tutorial at CEDAR | Forecaster Tools
Missions near Earth/in Earth-orbit | MMS | Van Allen Probes | THEMIS | MESSENGER | STEREO | Spitzer | MAVEN | MSL | Dawn | Kepler | EPOXI | Juno | CASSINI | Voyager | New Horizons | Sounding Rockets | International
Research Community Support | CCMC Workshops | NASA Robotic Mission Operator Workshops | LWS Support | Exo-CCMC | DREAM2 Support | HELCATS Support
iSWA | DONKI | Kameleon | StereoCat | EEGGL | CME Scoreboard | SEP Scoreboard | FLR Scoreboard | SEA5

2D Ionosphere output
Model: BATSRUS
Run: GEM_CEDAR_073015_1

This is the web interface for the visualization of: Ionosphere of simulation of solar wind flow around the Earth.

Go back to web page of run
Please review the default selections below and make your changes.

To start the graphics program click the Update Plot button. The resulting image will be displayed at this location of the page.

Should the result be a black image, then the graphics program encountered a programming error. Please report the set of input parameters used.

  Update Plot will update (generate) the plot with the chosen time and plot parameters below.
This will take some time (typically 5-10s) as data are read in and processed.

  Choose data time:
- or -
 Change time by moving
      output steps
- or -
 Create GIF movie (and archive of ASCII data outputs) with current plot settings
Note: This is a queue submission system requiring the following three additional inputs:
  • Start Time:
  • End Time: